The Origin Forum
File Exchange
Try Origin for Free
The Origin Forum
Home | Profile | Register | Active Topics | Members | Search | FAQ | Send File to Tech support
 All Forums
 Origin Forum
 Origin Forum
 Change x-axis of a plot from nubers to date

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Anti-Spam Code:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkUpload FileInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
Check here to subscribe to this topic.
   

T O P I C    R E V I E W
Locardas Posted - 02/08/2022 : 11:50:06 AM
Origin Ver. and Service Release (Select Help-->About Origin): 2021b
Operating System: Windows 10

Dear Origin Forum,

I have created a ribbon plot (Figure 1) whose x-axis I want to change from a numbering of 1-42 to a date+time unit.



When I create a corresponding X column in my workbook, Origin cannot distinguish between 2 different times on the same day.
The result is that the corresponding y-values are overlapping in the plot (see figure 2).



How do I get a plot that looks like Figure 1 but with a time scale?

Best regards,
Locardas
4   L A T E S T    R E P L I E S    (Newest First)
Locardas Posted - 02/09/2022 : 12:57:35 PM
quote:
Originally posted by minimax

Hi Locardas,

There is no problem of the time axis plot.

It display differently from the other one because the X data is not in monotonic order.

If you sort the column ascending, the 2 graphs will look basically the same.

PS, it is not 100% the same since the X data has some missing date, like 2019-12-16 is missing, so it will have a bigger gap.




Thanks for the tip, it worked perfectly!

With kind regards,
Locardas
minimax Posted - 02/09/2022 : 04:17:23 AM
Hi Locardas,

There is no problem of the time axis plot.

It display differently from the other one because the X data is not in monotonic order.

If you sort the column ascending, the 2 graphs will look basically the same.

PS, it is not 100% the same since the X data has some missing date, like 2019-12-16 is missing, so it will have a bigger gap.
Locardas Posted - 02/09/2022 : 03:02:33 AM
Hello Snow,

thank you for your offer, of course I'll be happy to let you take a look at my project:


!!https://my.originlab.com/ftp/forum_and_kbase/Images/Timeline_Plots.opju

Best wishes,
Locardas
snowli Posted - 02/08/2022 : 2:24:46 PM
Do you mind sharing your project?
It's hard to tell how the date column is set to Date or not since i can't tell if the date are right aligned. And not sure how you you modified the axis scale and tick labels.

And maybe when plotting for the first time, you can directly use A as X so no need to first plot with sample ID as X and change axis later.

Thanks, Snow