The Origin Forum
File Exchange
Try Origin for Free
The Origin Forum
Home | Profile | Register | Active Topics | Members | Search | FAQ | Send File to Tech support
 All Forums
 Origin Forum
 Origin Forum
 Origin crashes during project save

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Anti-Spam Code:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkUpload FileInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
Check here to subscribe to this topic.
   

T O P I C    R E V I E W
dab Posted - 02/06/2007 : 12:50:50 PM
Origin Version: 7.5 SR6
Operating System: XP

I have a project which crashes Origin when I try to save it, that is, I get the "Origin 7.5 has encountered an error and must close" dialog box. I have searched the Knowledge Base without success. I am trying to create a single page with multiple layers. Each layer has a simple plot with one set of data. I have opened the data from an Excel spreadsheet.

I can create two layers and save the project, but the crashes occur as I try to add the 3rd and 4th layer, but not always at the same layer added. It seems that the problem is becoming more severe.

Thanks for any suggestions. I can provide more details if necessary.
2   L A T E S T    R E P L I E S    (Newest First)
Laurie Posted - 02/06/2007 : 3:24:39 PM
Could be an issue with the Excel file and/or the saving of backup.opj prior to saving your project.

This may be fastest resolved by calling us. In the US, you can call 800 969 7720 and press option 7 at the menu, for technical support.

Thank you,
Laurie



OriginLab Technical Support
greg Posted - 02/06/2007 : 3:24:34 PM
It's impossible to say why this is happening without actually seeing the project. I would suspect something to do with dataset names.

Have you tried opening your Excel data in Origin worksheets and plotting that way?



The Origin Forum © 2020 Originlab Corporation Go To Top Of Page
Snitz Forums 2000