The Origin Forum
File Exchange
Try Origin for Free
The Origin Forum
Home | Profile | Register | Active Topics | Members | Search | FAQ | Send File to Tech support
 All Forums
 Origin Forum
 Origin Forum
 skip data point in graph

Note: You must be registered in order to post a reply.
To register, click here. Registration is FREE!

Screensize:
UserName:
Password:
Anti-Spam Code:
Format Mode:
Format: BoldItalicizedUnderlineStrikethrough Align LeftCenteredAlign Right Horizontal Rule Insert HyperlinkUpload FileInsert Image Insert CodeInsert QuoteInsert List
   
Message:

* HTML is OFF
* Forum Code is ON
Smilies
Smile [:)] Big Smile [:D] Cool [8D] Blush [:I]
Tongue [:P] Evil [):] Wink [;)] Clown [:o)]
Black Eye [B)] Eight Ball [8] Frown [:(] Shy [8)]
Shocked [:0] Angry [:(!] Dead [xx(] Sleepy [|)]
Kisses [:X] Approve [^] Disapprove [V] Question [?]

 
Check here to subscribe to this topic.
   

T O P I C    R E V I E W
nuriburi Posted - 07/09/2008 : 09:14:57 AM
hi,
i would like to plot a data serie as a line+symbol graph. my problem is to create a continous line when a data point is missing somewhere in between. since there are 8 data sets i wouldn't like to make different x-axis where i delete the missing value-point.
do you have any suggestions?
2   L A T E S T    R E P L I E S    (Newest First)
nuriburi Posted - 07/10/2008 : 10:16:37 AM
Thank you very much, that was exactly what I needed!
VincentLiu Posted - 07/09/2008 : 11:13:55 PM
Hi nuiburi,

Firstly, you can double-click on the plot to open the Plot Details Dialog, and then click on the Graph icon.



Secondly, select the Display Tab, and then check Connect line across Missing Data check box.



You can also refer to the link to get the details:

http://www.originlab.com/www/helponline/Origin8/en/customzing_your_graph/setting_the_page_color_and_other_page_display_preferences.htm

Regards,
Vincent
OriginLab Technical Services

The Origin Forum © 2020 Originlab Corporation Go To Top Of Page
Snitz Forums 2000