Note: You must be registered in order to post a reply. To register, click here. Registration is FREE!
T O P I C R E V I E W
newton84
Posted - 11/22/2010 : 10:51:35 AM Hello everybody,
I have a problem plotting data (~17 Mio. points) . When a certain number of data points is exceeded, the plot window with axes appear, but the curve inside does not show up. When limiting the data to a certain range, it works, but then I cant see all the desired date.
1) Is there a way of only plotting every 100th point, and therefore to detour the problem (although its a non optimal solution? 2) Is there a way of plotting all data points by increasing memory, or similar solutions?
1) If you have a scatter plot or a line+symbol plot, in the Plot Details dialog there will be a Drop Lines tab. You can enable the Skip Points setting:
Select this check box in the Data Points Display Control group to display a specified frequency of data points. Type the frequency in the associated text box. For example, type 5 in the text box to display every 5th data point as a symbol.