Origin Ver. and Service Release (Select Help-->About Origin): 9.0 Pro SR2 Operating System: Win8 x64
Hi, I ran into the following problem: Having a graph with two layers I want to link the x-axis of the second layer to the x-axis of the first layer.
Doing this:
layer -s 2; layer.link = 1; layer.x.link = 1;
Works (I checked it using laymanage and the dropdowns / checkmarks are all set correctly).
However: The page is not updated and the graph is visually still not linked to the right scale.
When I use laymanage it works because somehow the layer gets redrawn / updated.
I tried
doc -u; doc -uw; layer -a;
but without success. Am I doing something wrong or is this a bug?
Thanks a lot in advance!
Cheers, lunchpack |
|