metroid02
Austria
10 Posts |
Posted - 01/19/2018 : 07:00:42 AM
|
Dear Origin Team, I am currently stumped and need some assistance.
I am trying to integrate a signal from the lowest point of the plot to an arbitrary distant point. 
So for instance take a look at the 100ns (red) plot. I want to find a way to calculate the minimum value for the large dip right around 200ns x value. I want to then use that corresponding x value and integrate all the way to 1200 (basically the rest of the signal). I want to do this process for all the different lines (100-600ns). The problem is that I dont know how to accurately: a) calculate that minimum point b) define the range for the integration.
I have an idea of doing the same integration, but for a maximum to the left of the dip. This way I wouldnt lose some of the signal.
Also, with regards to b: I realize that I can manually drag/define the limits with the cursor, but I would prefer to simply input the "min" value into the range.
Thanks for any help/support you can give me. |
|