Origin Ver. and Service Release (Select Help-->About Origin): 6.0 Operating System: Windows Vista
I have an existing with 7 rows and a graph produced from that dataset. I want to add a new line to the set, so I will have 8 rows, and meanwhile I want to update the existing graph without constructing a new graph from scratch. How can I do this, is there any way to make graphs automatically recognize new entries in their datasets?
Hi, Origin always maintains the plot consistent to the data in the source column, unless it was plotted with a specific range. (But, old Origin such as your ver.6 doesn't have the concept of range-specific plotting.)