T O P I C R E V I E W |
shiuyeung.hui |
Posted - 03/08/2007 : 05:12:29 AM Origin Version (Select Help-->About Origin): 7.5 Operating System: XP
Hi
I am trying to perform a Hill fit on the data below, while constraint the curve to:
i. fit through (0,6.86E-10) at the beginning,
and
ii. fit through (1,0) at the end (minimum value of B(Y) is 0, basically)
The data:
A(X) B(Y) 0 6.86E-10 3E-8 5.92E-10 3E-7 4.19E-10 3E-6 9.46E-11 3E-5 2.86E-11 1 0
Would love to hear your suggestions, I am just starting with this program.
S |
1 L A T E S T R E P L I E S (Newest First) |
larry_lan |
Posted - 03/09/2007 : 05:41:30 AM HI:
Since it is not able to use linear constraint for Hill function, I think you can't fit through (0,6.86E-10) and (1,0).
Personally speaking, do you think Hill function is a good model for your data? The X value change too much from 3E-5 to 1. I think you can transform X to log(X) and fit by Dose Response function.
Larry OriginLab Technical Services |
|
|